Tensioning
Bridon personnel will always be on-site to help with the running of the ropes and to perform the final tensioning. All rigging screws along each of the four ropes shall be adjusted equally to achieve the required tension. The required tension shall be determined at the time of tensioning and is dependant on the current ambient temperature as shown in Table A.
Ambient Temperature


