New Installation Checklist
Contact Number:_______________________________
Job Description:_______________________________
Foundations Installed By:_______________________________
Company:_______________________________
Date Foundations Complete:_______________________________
Final Installation & Tensioning By:________________Bridon New Zealand
Final Installation Date:________________
Installation Queries Contact - Paul Childs Bridon New Zealand Ltd
Ph: 09 2744299 or 027 474 1603
Email: pchilds@cookes.co.nz
Checklist
*Contractor to complete shaded areas
| 1. | END / INTERMEDIATE ANCHORAGES | ? | COMMENTS |
|---|---|---|---|
| 1.1 | Excavations - dimensions as per drawings as supplied by Bridon New Zealand - vertical sides | ? | |
| 1.2 | Anchor frame - correctly positioned in accordance with drawings | ? | |
| 1.3 | Concrete to grade 25 Mpa (minimum) | ? | |
| 1.4 | Compaction using internal vibration | ? | |
| 1.5 | Trowelled finish to all exposed surfaces, & top surface formed as per drawings supplied | ? |
| 2. | POST FOUNDATIONS | ? | COMMENTS |
|---|---|---|---|
| 2.1 | Excavation |


